翻訳と辞書
Words near each other
・ Line 6, Kunming Rail Transit
・ Line 6, Shanghai Metro
・ Line 6, Shenzhen Metro
・ Line 7
・ Line 7 (CPTM)
・ Line 7 (Madrid Metro)
・ Line 7, Beijing Subway
・ Line 7, Guangzhou Metro
・ Line 7, Shanghai Metro
・ Line 7, Shenzhen Metro
・ Line 7, Suzhou Rail Transit
・ Line 8
・ Line 8 (CPTM)
・ Line 8 (Madrid Metro)
・ Line 8, Beijing Subway
Line 8, Guangzhou Metro
・ Line 8, Shanghai Metro
・ Line 8, Shenzhen Metro
・ Line 9
・ Line 9 (CPTM)
・ Line 9 (Madrid Metro)
・ Line 9, Beijing Subway
・ Line 9, Guangzhou Metro
・ Line 9, Shanghai Metro
・ Line 9, Shenzhen Metro
・ Line 9, Tianjin Metro
・ Line A
・ Line A (Buenos Aires Underground)
・ Line A (EuskoTran)
・ Line A (Prague Metro)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 8, Guangzhou Metro : ウィキペディア英語版
Line 8, Guangzhou Metro

| image = Baogang Dadao Station Site.JPG
| image_width = 265px
| image_alt =
| caption = Platform of Baogang Dadao Station
| type = Rapid transit
| system = Guangzhou Metro
| status = Operational
| locale = Guangzhou, China
| start = Fenghuang Xincun
| end = Wanshengwei
| stations = 13
| routes = 1
| ridership =
| open = 25 September 2010
| close =
| owner = City of Guangzhou
| operator = Guangzhou Metro Corporation
| character = Underground
| depot =
| stock =
| linelength =
| tracklength =
| notrack = 2
| gauge =
| el = Overhead lines, 1,500 V DC
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
Line 8 of the Guangzhou Metro () or Pazhou Line () is an east-west line on the system that runs from Fenghuang Xincun to Wanshengwei, spanning a total of 14.8 km with 13 stations. It interchanges with Line 2 at Changgang, Line 3 at Kecun and Line 4 at Wanshengwei. All stations on Line 8 are underground.〔(Guangzhou Metro Light Rail System, China )〕 Line 8's color is teal.
Line 8 used to run as part of Line 2 until the extension to both lines open for trial operation on September 25, 2010.〔http://www.canton.com.cn/node/160〕
The part that was left unopened from Baogang Dadao to Fenghuang Xincun started operation on November 3, 2010.
* June 28, 2003: Xiaogang - Pazhou
* December 26, 2005: Pazhou - Wanshengwei
* September 25, 2010: Changgang - Xiaogang
* November 3, 2010 Baogang Dadao - Fenghuang Xincun
==Stations==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 8, Guangzhou Metro」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.